Free load planner · Road, rail, sea and air

Plan the load. Check every axle. Free.

Pick the trailer, add your pallets and get a 3D loading sequence that keeps each axle group inside its legal limit. No sign-up, nothing stored on our side. When the load is ready to move, we can quote it the same day.

  • 19 trucks, trailers and containersTautliners, mezzanine decks, drop decks, B-doubles, skels, rigids and a road train.
  • NHVR mass limits built inGML, CML and HML, with axle loads worked out through every kingpin and turntable.
  • A forklift sequence, step by stepWhich pallet goes where, in order, with the axle weights at every step of the load.
  • A plan sheet you can sendCopy the run-sheet, or attach the load to a quote request in one click.

Free tool

Trailer load planner

Built for loaders, forklift drivers and whoever gets the call when a truck fails at the weighbridge. Pick the vehicle, add the pallets, and get a 3D load with a forklift sequence that keeps every axle group legal. It runs in your browser and your freight list stays there.

  • 19 vehicle typesSemi, B-double, mezzanine decks, drop decks, skels with 20 ft and 40 ft containers, rigids, a road train.
  • Every axle group checkedSteer, drive, tri-axle and dolly groups against GML, CML and HML, through every kingpin and turntable.
  • Loading sequenceStep through the load pallet by pallet, with the axle masses after each step.
  • Plan sheet and quoteCopy the run-sheet, or send the load straight into a quote request.

What next

Loaded it? We can move it.

The planner is free and stays free. Changeover makes its money moving freight, hiring out trucks and looking after small fleets. Pick the one you need.

Get a freight quote

Road, rail, sea or air, one partner for every leg. Send the lane and the load; we send back legs, days and a price before anything moves.

Quote a move

Hire a truck or trailer

Rigid trucks, prime movers and trailers by the day, week or month. Cover a unit off the road, or add capacity for a contract without buying.

Ask about hire

Support for small fleets

Running 1 to 5 trucks? Compliance, NHVAS, real cost per km and the admin that eats your evenings. Start with a business health check.

See operator services

Freight

One partner for every leg

Book one mode or several. We look after the handover between them, so you get one reference, one person to call and one invoice from the first kilometre to the last.

Road

Linehaul, metro and the changeover lanes we're known for. Semis, B-doubles and road trains where gazetted.

Road services

Rail

Interstate intermodal for heavy, bulk and long-distance freight, with road at each end.

Rail services

Sea

Bass Strait, coastal where a service runs, and international containers through the gateways.

Sea services

Air

Next flight out when the deadline says so, domestic and international.

Air services

Service board

Everything we move or arrange

Filter by mode, open a row for the detail, or send it straight into a quote request.

Services across road, rail, sea and air, truck and trailer hire, and support for operators
CodeServiceModesWhere it runs

Customs brokerage, dangerous goods carriage, air cargo screening, insurance and finance are arranged through licensed partners. Transit times are industry planning figures, not promises.

Lanes

Plan a lane

Pick two hubs and we'll show the legs, the modes and the indicative days. Your quote carries the real schedule and the price.

Preference

Indicative days from typical schedules and corridor distances. Sea legs only where a scheduled service runs. No price is implied; your quote carries the real days and the price.

Click a hub to set it as the origin, then another as the destination. Not to scale.

Planning times

Australia, connected

Door to door, indicative and subject to service schedules. Rail disruptions typically add 1 to 2 days.

Indicative planning times, door to door, 2026. Open a lane for the route detail.
LanekmRoadRailSeaAir

Why the name

How a changeover works

A changeover is the oldest trick in linehaul: two drivers meet halfway, swap trailers and each turns for home. We built a business around doing that handover well, on every mode.

1

Two trucks leave, one from each end

A Sydney driver and a Melbourne driver both start in the afternoon, each pulling a loaded trailer for the other city.

2

They meet at the changeover point

At a yard near the midpoint, the trailers swap. Paperwork, seals and the reference stay the same; only the prime mover changes.

3

Both drivers sleep at home

Each driver turns back with the other's trailer. The freight arrives overnight; nobody spends the night in a bunk or a motel.

Fresher drivers, fewer fatigue breaches, no overnight costs. Your freight keeps moving while both drivers are in their own beds.

For operators

Support for small fleets

Running 1 to 5 trucks means you're the driver, the dispatcher and the accounts department. We take the parts that keep you up at night, starting with a health check that shows where the money is leaking.

Business health check

Compliance status, your real cost per km, what you should be charging and where to save. A written list of fixes in priority order.

Book a health check

Compliance and NHVAS

Chain of Responsibility, fatigue and work diaries, maintenance records, NHVAS mass and maintenance accreditation. Set up once and kept current.

Get compliant

Back office and marketing

Business setup, terms of trade, invoicing and BAS referrals, fuel tax credit claims, plus a website and Google Business Profile that bring work in.

Hand it over

Truck and trailer hire

Cover for a unit off the road, or extra trailers for a contract without buying. Tautliners, flat tops, drop decks and skels.

Ask about hire

Buying power

One truck has no leverage on fuel, tyres and parts. Pooled across the network it does. We pass the discounts through.

Join the pool

Insurance and faster payment

Introductions to a licensed insurance broker and to invoice-finance partners so you're not waiting 60 days to be paid. We refer; the licensed partner advises.

Get an introduction

Questions

Load planning, answered

How many pallets fit on a semi-trailer or a B-double?

With standard 1165 × 1165 mm pallets: 22 on a 13.6 m tautliner semi-trailer, 34 on a 26 m B-double (12 on the A trailer and 22 on the B), and 68 on a B-double with mezzanine decks on both trailers. A 3-axle rigid takes 12, a 2-axle rigid 8. A 20 ft container holds 10 and a 40 ft container 20.

Those are floor spaces. Weight is the other limit, which is why the planner checks every axle group as well as the count.

What are GML, CML and HML?

They are the three NHVR mass-limit levels. General Mass Limits (GML) apply to any registered vehicle. Concessional Mass Limits (CML) allow a little more on some axle groups, but the operator needs NHVAS Mass Management accreditation. Higher Mass Limits (HML) allow more again and need road-friendly suspension, accreditation and an approved HML route.

For a 6-axle semi-trailer the combination gross is 42.5 t at GML, 43.5 t at CML and 45.5 t at HML. For a 9-axle B-double it is 62.5, 64.5 and 68 t.

How does the planner work out axle weights?

By lever-arm statics. Each pallet's weight sits at its position on the deck; the planner resolves it through the trailer's axle group and its kingpin, then through the prime mover's drive and steer axles, and through every turntable and dolly on a B-double or road train. Tare masses and coupling positions are typical figures for each combination.

Treat the result as a close estimate and always confirm at a weighbridge, especially near a limit.

What does "auto-rearrange to fix axle overloads" do?

After the first packing pass, the planner tries swapping whole rows forward or back until every axle group is inside its limit, keeping heavy pallets low and spread across both lanes. If it can't find a legal arrangement, the warnings panel tells you which group is over and by how much.

Does the planner store my freight list?

Only in your own browser, so it is there when you come back on the same device. Nothing is sent to us unless you choose to attach the plan to a quote request.

Can I send my load plan with a quote?

Yes. Press "Get a quote for this load" in the Weights panel, or tick "Attach my load plan" on the quote form. The vehicle, pallet list, gross mass and pallet spaces go into the request, so we can price it without a second phone call.

What is a changeover?

A changeover is when two linehaul drivers meet partway along a lane, swap trailers and each head back to where they started. The freight keeps moving overnight and both drivers sleep at home. It's where our name comes from, and it's how we run our busiest road lanes.

Get a quote

Tell us what's moving

One person, not a queue

Send a brief: what, from where, to where and when. You get a plan with legs, modes, transfer points, indicative days and a price before anything moves. If a leg slips, you hear it from us first.

Operators: the same form books a health check or a hire. Pick what you need and skip the fields that don't apply.

Mon to Fri, 7 am to 6 pm AEST

Suburb, town or port

Add where the freight is coming from.

Suburb, town, port or site

Add where it is going.

What it is and how it is packed, or the service you're after

Modes acceptable
Special handling

Adds the vehicle, pallet list, gross mass and pallet spaces from the load you built in the load planner.

Email or phone, one is enough

Add an email or phone so we can reply.

Request ready
Ref
CO-Q-—
Need
Freight quote
Origin
—
Destination
—
Cargo
—
Weight / volume
—
Modes
Any
Special
none
Ready
—

    We reply within one business day. Your request goes straight to our inbox; nothing else is stored on this page. Prefer email? Press Copy the request and paste it into an email to hello@changeover.au.